Pages that link to "Item:Q5949902"
From MaRDI portal
The following pages link to A note on weighted completion time minimization in a flexible flow shop (Q5949902):
Displaying 5 items.
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises (Q492824) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- Hybrid Flow Shop Scheduling: Heuristic Solutions and LP-Based Lower Bounds (Q5232862) (← links)