The following pages link to Najib M. Najid (Q606602):
Displaying 6 items.
- An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility (Q606604) (← links)
- Models for robust tactical planning in multi-stage production systems with uncertain demands (Q1046703) (← links)
- Single item lot sizing problems (Q2566041) (← links)
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows (Q3392030) (← links)
- (Q5369290) (← links)
- Integrated production planning and preventive maintenance in deteriorating production systems (Q5900277) (← links)