The following pages link to (Q6077482):
Displaying 3 items.
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)
- Optimization of inventory and capacity in large-scale assembly systems using extreme-value theory (Q6504506) (← links)
- Optimization of inventory and capacity in large-scale assembly systems using extreme-value theory (Q6601480) (← links)