The following pages link to Ba-Yi Cheng (Q683925):
Displaying 18 items.
- Uniform parallel machine scheduling problems with fixed machine cost (Q683926) (← links)
- (Q693405) (redirect page) (← links)
- Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes (Q693407) (← links)
- Minmizing service span with batch-position-based learning effects (Q828675) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- Single-machine and parallel-machine serial-batching scheduling problems with position-based learning effect and linear setup time (Q1730624) (← links)
- The setting and optimization of quick queue (Q1730843) (← links)
- Integrated optimization of material supplying, manufacturing, and product distribution: models and fast algorithms (Q1735170) (← links)
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities (Q1800447) (← links)
- The setting and optimization of quick queue with customer loss (Q2190285) (← links)
- Minimising makespan for two batch-processing machines with non-identical job sizes in job shop (Q2935125) (← links)
- (Q3109181) (← links)
- Single batch machine scheduling with deliveries (Q4632900) (← links)
- Optimal decision in MC supply chain with overconfident retailer based on the newsvendor model (Q5001397) (← links)
- Fashion retail competition on product greenness with overconfidence (Q5034785) (← links)
- Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes (Q5172586) (← links)
- (Q5257158) (← links)
- Approximation algorithms for scheduling single batch machine with incompatible deteriorating jobs (Q6050594) (← links)