The following pages link to Pius J. Egbelu (Q706976):
Displaying 17 items.
- Algorithm for minimizing weighted earliness penalty in single-machine problem (Q706977) (← links)
- Establishment of economic production rate, production batch size, and production sequence in manufacturing systems with flexible routing (Q1261323) (← links)
- Integration of operation routing and economic production quantity decisions in batch manufacturing systems (Q1266616) (← links)
- Positioning of automated guided vehicles in a loop layout to improve response time (Q1319544) (← links)
- Scheduling of inbound and outbound trucks in cross docking systems with temporary storage (Q2383135) (← links)
- Route selection and flow control in a multi-stage manufacturing system with heterogeneous machines within stages (Q3489775) (← links)
- A heuristic approach to the three-dimensional cargo-loading problem (Q3820381) (← links)
- Operation routeing with lot sizing consideration in a manufacturing system (Q4206549) (← links)
- Dynamic relative positioning of AGVs in a loop layout to minimize mean system response time (Q4230173) (← links)
- Minimizing production flow time in a process and assembly job shop (Q4245649) (← links)
- Production planning models for a central factory with multiple satellite factories (Q4394283) (← links)
- ADVISOR: A computer-aided material handling equipment selection system (Q4399128) (← links)
- Unidirectional AGV guidepath network design: A heuristic algorithm (Q4474696) (← links)
- A framework for the selection of idle vehicle home locations in an automated guided vehicle system (Q4496931) (← links)
- Quadratic assignment problem QAP with adaptable material handling devices (Q4497217) (← links)
- Reconfiguration of a job shop to respond to product mix changes based on a virtual production system concept (Q4666770) (← links)
- Selection of circulatory loops for patrol vehicles operating in a network (Q4674384) (← links)