Pages that link to "Item:Q779771"
From MaRDI portal
The following pages link to Type-E disassembly line balancing problem with multi-manned workstations (Q779771):
Displaying 6 items.
- An exact solution method for multi-manned disassembly line design with and/or precedence relations (Q821861) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- A hybrid algorithm for the vehicle routing problem with and/or precedence constraints and time windows (Q2147032) (← links)
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach (Q2664414) (← links)
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times (Q2676318) (← links)
- Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem (Q6159499) (← links)