Pages that link to "Item:Q840149"
From MaRDI portal
The following pages link to A bicriteria parallel machine scheduling with a learning effect of setup and removal times (Q840149):
Displaying 21 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects (Q534925) (← links)
- Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times (Q552424) (← links)
- Single machine scheduling with exponential sum-of-logarithm-processing-times based learning effect (Q611500) (← links)
- Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times'' (Q638898) (← links)
- Single-machine due-window assignment problem with learning effect and deteriorating jobs (Q639174) (← links)
- Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects (Q763108) (← links)
- A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times (Q967801) (← links)
- A due-date assignment problem with learning effect and deteriorating jobs (Q967804) (← links)
- A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect (Q1008577) (← links)
- Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning (Q1667775) (← links)
- Single-machine and parallel-machine serial-batching scheduling problems with position-based learning effect and linear setup time (Q1730624) (← links)
- Some single-machine scheduling with sum-of-processing-time-based and job-position-based processing times (Q1788956) (← links)
- Several single-machine scheduling problems with general learning effects (Q1930782) (← links)
- Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects (Q2008062) (← links)
- Scheduling jobs with position and sum-of-processing-time based processing times (Q2278782) (← links)
- Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times (Q2290196) (← links)
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects (Q2629988) (← links)
- Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times (Q2931172) (← links)
- A Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning Effect (Q5255177) (← links)
- A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (Q6164626) (← links)