Pages that link to "Item:Q852993"
From MaRDI portal
The following pages link to Using aggregation to optimize long-term production planning at an underground mine (Q852993):
Displaying 17 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Optimization-based heuristics for underground mine scheduling (Q299816) (← links)
- Runtime reduction techniques for the probabilistic traveling salesman problem with deadlines (Q958456) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- Optimizing the open pit-to-underground mining transition (Q1752806) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- Underground mine scheduling under uncertainty (Q2031110) (← links)
- Uncertainty integration in dynamic mining reserves (Q2040718) (← links)
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine (Q2275613) (← links)
- Short-term planning optimization model for underground mines (Q2289891) (← links)
- Maximizing the net present value of a Steiner tree (Q2349527) (← links)
- Solving network design problems via iterative aggregation (Q2516352) (← links)
- Challenges and Advances in A Priori Routing (Q3564352) (← links)
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS (Q3580199) (← links)
- Optimization for <i>L</i><sub>1</sub>-Norm Error Fitting via Data Aggregation (Q4995061) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Scalable timing-aware network design via Lagrangian decomposition (Q6112744) (← links)