Pages that link to "Item:Q858442"
From MaRDI portal
The following pages link to Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442):
Displaying 9 items.
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (Q1956018) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem (Q2273695) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- Unrelated parallel machine scheduling problem with special controllable processing times and setups (Q2676390) (← links)
- A simulation‐based differential evolution algorithm for stochastic parallel machine scheduling with operational considerations (Q5416762) (← links)
- Reducing tardy batches by \textit{seru} production: model, exact solution, cooperative coevolution solution, and insights (Q6068681) (← links)