Pages that link to "Item:Q955314"
From MaRDI portal
The following pages link to Identical part production in cyclic robotic cells: Concepts, overview and open questions (Q955314):
Displaying 9 items.
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance (Q342566) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Parametric algorithms for 2-cyclic robot scheduling with interval processing times (Q640307) (← links)
- Cyclic robot scheduling for 3D printer-based flexible assembly systems (Q829186) (← links)
- Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models (Q976500) (← links)
- On the existence of dominating 6-cyclic schedules in four-machine robotic cells (Q1754378) (← links)
- An analysis of cyclic scheduling problems in robot centered cells (Q1762114) (← links)
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers (Q2412847) (← links)