Pages that link to "Item:Q958440"
From MaRDI portal
The following pages link to LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440):
Displaying 28 items.
- An integrated approach for earthwork allocation, sequencing and routing (Q296873) (← links)
- Medium range optimization of copper extraction planning under uncertainty in future copper prices (Q297027) (← links)
- Optimization-based heuristics for underground mine scheduling (Q299816) (← links)
- Long term production planning of open pit mines by ant colony optimization (Q300074) (← links)
- Aggregation heuristic for the open-pit block scheduling problem (Q321137) (← links)
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty (Q322445) (← links)
- MineLib: a library of open pit mining problems (Q363555) (← links)
- Tailored Lagrangian relaxation for the open pit block sequencing problem (Q490234) (← links)
- The precedence constrained knapsack problem: separating maximally violated inequalities (Q494425) (← links)
- A sliding time window heuristic for open pit mine block sequencing (Q691428) (← links)
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines (Q887202) (← links)
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem (Q992718) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- A local branching heuristic for the open pit mine production scheduling problem (Q1752798) (← links)
- Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine (Q2275613) (← links)
- Open pit mine planning with degradation due to stockpiling (Q2289888) (← links)
- Hyper-heuristic approaches for strategic mine planning under uncertainty (Q2289889) (← links)
- Practical performance of an open pit mine scheduling model considering blending and stockpiling (Q2289890) (← links)
- Evolutionary approach for large-scale mine scheduling (Q2663534) (← links)
- New partial aggregations for multicommodity network flow problems: an application to the fixed-charge network design problem (Q2669599) (← links)
- Constructing branching trees of geostatistical simulations (Q2676486) (← links)
- Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing (Q2830758) (← links)
- Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)