Pages that link to "Item:Q976442"
From MaRDI portal
The following pages link to Due dates assignment and JIT scheduling with equal-size jobs (Q976442):
Displaying 15 items.
- Scheduling problems with two competing agents to minimized weighted earliness-tardiness (Q339552) (← links)
- Due-window assignment problems with unit-time jobs (Q902534) (← links)
- Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time (Q1617277) (← links)
- Complexities of four problems on two-agent scheduling (Q1653276) (← links)
- Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties (Q2228360) (← links)
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems (Q2256205) (← links)
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms (Q2298093) (← links)
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains (Q2355078) (← links)
- Due-window assignment with identical jobs on parallel uniform machines (Q2355801) (← links)
- An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs (Q2445244) (← links)
- A survey on scheduling problems with due windows (Q2630089) (← links)
- Just-in-Time Scheduling with Equal-Size Jobs (Q2958671) (← links)
- SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT (Q4626601) (← links)
- Single‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activity (Q5744000) (← links)
- A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights (Q6053517) (← links)