A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights
From MaRDI portal
Recommendations
- Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs
- Due-window assignment scheduling problems with position-dependent weights on a single machine
- Optimization for due-window assignment scheduling with position-dependent weights
- Single machine scheduling and due date assignment with positionally dependent processing times
- Schedules with due-date assignment and position-dependent processing times
Cites work
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Batch sizing and just-in-time scheduling with common due date
- Bicriteria scheduling for due date assignment with total weighted tardiness
- Common due date assignment scheduling for a no-wait flowshop with convex resource allocation and learning effect
- Common due-window assignment for single-machine scheduling with generalized earliness/tardiness penalties and a rate-modifying activity
- Due dates assignment and JIT scheduling with equal-size jobs
- Due-window assignment scheduling in the proportionate flow shop setting
- Due-window assignment scheduling problems with position-dependent weights on a single machine
- Flow shop resource allocation scheduling with due date assignment, learning effect and position-dependent weights
- Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
- scientific article; zbMATH DE number 1634827 (Why is no real title available?)
- Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance
- Minsum scheduling with acceptable lead-times and optional job rejection
- Optimal restricted due date assignment in scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Proportionate flowshop scheduling with position-dependent weights
- Research on single-machine scheduling with position-dependent weights and past-sequence-dependent delivery times
- Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method
- Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
Cited in
(1)
This page was built for publication: A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6053517)