A Graphical Method Applicable to Age-Replacement Problems
From MaRDI portal
Cited in
(7)- The TTT-concept and replacements to extend system life
- Nonparametric repair-limit replacement policies with imperfect repair
- Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting
- Generalized Linear Failure Rate Distribution
- Determination/estimation of an optimal replacement interval under minimal repair
- A characterization and sufficient conditions for the total time on test transform order
- Generalized total time on test transform for weighted variables, properties and applications
This page was built for publication: A Graphical Method Applicable to Age-Replacement Problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3968737)