A cycle based optimization model for the cyclic railway timetabling problem
From MaRDI portal
Recommendations
Cited in
(10)- Nominal and robust train timetabling problems
- A simulated annealing algorithm for first train transfer problem in urban railway networks
- A Lagrangian heuristic algorithm for a real-world train timetabling problem
- scientific article; zbMATH DE number 5343212 (Why is no real title available?)
- Optimizing schedules of rail train circulations by tabu search algorithm
- A matching approach for periodic timetabling
- Integrating passengers' routes in periodic timetabling: a SAT approach
- Finding short integral cycle bases for cyclic timetabling
- Periodic timetabling with cyclic order constraints
- Non-cyclic train timetabling and comparability graphs
This page was built for publication: A cycle based optimization model for the cyclic railway timetabling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2759921)