A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem
From MaRDI portal
Recommendations
- Scheduling unrelated parallel batch processing machines with non-identical job sizes
- Stochastic Scheduling on Unrelated Machines
- A Better Heuristic for Preemptive Parallel Machine Scheduling with Batch Setup Times
- Unrelated machine scheduling with stochastic processing times
- Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times
Cited in
(7)- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates
- An exact branch-and-price algorithm for scheduling rescue units during disaster response
- A survey of scheduling problems with setup times or costs
- An adaptive scheduling algorithm for a parallel machine problem with rework processes
- Processing time generation schemes for parallel machine scheduling problems with various correlation structures
- A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity
This page was built for publication: A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5437769)