A general multi-shift scheduling system
From MaRDI portal
Recommendations
- Rota: A research project on algorithms for workforce scheduling and shift design optimization
- Efficient generation of rotating workforce schedules
- Multiple shift scheduling of workforce on four-day workweeks
- A Modular Approach to Optimal Multiple-Shift Manpower Scheduling
- Solver independent rotating workforce scheduling
Cited in
(19)- A flexible MILP model for multiple-shift workforce planning under annualized hours
- Efficient generation of rotating workforce schedules
- Solver independent rotating workforce scheduling
- ``You have to get wet to learn how to swim applied to bridging the gap between research into personnel scheduling and its implementation in practice
- Shift rostering using decomposition: assign weekend shifts first
- Instance space analysis for a personnel scheduling problem
- Counting and enumerating feasible rotating schedules by means of Gröbner bases
- Modeling and solving a real-life multi-skill shift design problem
- Minimizing shifts for personnel task scheduling problems: a three-phase algorithm
- Rota: A research project on algorithms for workforce scheduling and shift design optimization
- scientific article; zbMATH DE number 1728537 (Why is no real title available?)
- scientific article; zbMATH DE number 5808215 (Why is no real title available?)
- scientific article; zbMATH DE number 1275845 (Why is no real title available?)
- Shiftwork scheduling algorithms with phase-delay feature
- scientific article; zbMATH DE number 1926622 (Why is no real title available?)
- A constructive heuristic for staff scheduling in the Glass industry
- A General Branch-and-Cut Framework for Rotating Workforce Scheduling
- Fifty years of operational research: 1972--2022
- Rostering in a rail passenger carrier
This page was built for publication: A general multi-shift scheduling system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4681719)