A general repeat inspection plan for dependent multicharacteristic critical components
From MaRDI portal
Recommendations
- A complete inspection plan for dependent multicharacteristic critical components
- An optimal repeat inspection plan with several classifications
- A general inspection plan for critical multicharacteristic components
- An Optimal Complete Inspection Plan for Critical Multicharacteristic Components
- scientific article; zbMATH DE number 815736
Cites work
- scientific article; zbMATH DE number 3297773 (Why is no real title available?)
- A complete inspection plan for dependent multicharacteristic critical components
- A sequential attribute sampling inspection game for item facilities
- An Optimal Complete Inspection Plan for Critical Multicharacteristic Components
- An optimal repeat inspection plan with several classifications
- An optimal sequence in multicharacteristic inspection
- Economic design of screening procedures when the rejected items are reprocessed
- Impact of inspection errors on performance measures of a complete repeat inspection plan
- Sequential inspection sampling to avoid failure critical items being in an at risk condition
- The economic effects of inspector error on attribute sampling plans
Cited in
(5)- Designing repetitive screening procedures with imperfect inspections: an empirical Bayes approach
- A nonpolynomial optimal algorithm for sequencing inspectors in a repeat inspection system with rework
- An optimal repeat inspection plan with several classifications
- An Optimal Complete Inspection Plan for Critical Multicharacteristic Components
- Modelling economic order quantities, considering buy and repair options for defective items, and allowing for shortages and inspection errors
This page was built for publication: A general repeat inspection plan for dependent multicharacteristic critical components
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q933508)