A hierarchical model for the cell loading problem of cellular manufacturing systems
From MaRDI portal
Recommendations
- A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
- Cell design and loading in the presence of alternative routing
- A methodology for integrating cell formation and production planning in cellular manufacturing
- An integrated model for production planning and cell formation in cellular manufacturing systems
- Design of cellular manufacturing systems
Cited in
(10)- A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
- An efficient exact model for the cell formation problem with a variable number of production cells
- A hierarchical cellular manufacturing system
- Static and dynamic operator allocation problems in cellular manufacturing systems
- A mathematical approach for integrating the cell design and production planning decisions
- scientific article; zbMATH DE number 869757 (Why is no real title available?)
- A Triangular Stochastic Facility Layout Problem in a Cellular Manufacturing System
- Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
- Scheduling in cellular manufacturing systems: an heuristic approach
- Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment
This page was built for publication: A hierarchical model for the cell loading problem of cellular manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245627)