A multi-objective optimization method of flexible job-shop lot-splitting scheduling
From MaRDI portal
Recommendations
- Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
- Multiobjective optimization for complex flexible job-shop scheduling problems
- Multi-objective integration of flexible collaborative planning and fuzzy flexible lot-splitting scheduling based on the Pareto optimal
- Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
- An efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteria
- Modeling and analysis of multiobjective lot splitting for \(N\)-product \(M\)-machine flowshop lines
- A batch splitting method for a job shop scheduling problem in an MRP environment
- Integrating preferences within multiobjective flexible job shop scheduling
Cited in
(7)- Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
- Multiobjective optimization for complex flexible job-shop scheduling problems
- Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
- A new parallel algorithm based on DE for batch splitting job shop scheduling under multiple-resource constraints
- Multi-objective integration of flexible collaborative planning and fuzzy flexible lot-splitting scheduling based on the Pareto optimal
- Multi-objective hybrid optimization of lot scheduling for bar mill process
- Modeling and analysis of multiobjective lot splitting for \(N\)-product \(M\)-machine flowshop lines
This page was built for publication: A multi-objective optimization method of flexible job-shop lot-splitting scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2886120)