A new method for constructing a minimal PERT network
From MaRDI portal
Recommendations
- A heuristic for constructing activity-on-arrow pert networks with minimal dummy activities
- New heuristics for modeling temporal constraints and generating PERT network with minimum number of dummy-arcs
- scientific article; zbMATH DE number 1234734
- On the computational complexity of the minimum-dummy-activities problem in a pert network
- The minimum dummy task problem
Cites work
- scientific article; zbMATH DE number 1517143 (Why is no real title available?)
- scientific article; zbMATH DE number 5199052 (Why is no real title available?)
- scientific article; zbMATH DE number 3218572 (Why is no real title available?)
- scientific article; zbMATH DE number 3378735 (Why is no real title available?)
- A Random Activity Network Generator
- CTP: A new constraint-based formalism for conditional, temporal planning
- Comment Construire un Graphe Pert Minimal
- Complexity of the minimum-dummy-activities problem in a pert network
- Computer construction of project networks
- Critical-Path Planning and Scheduling: Mathematical Basis
- On direction-preserving maps of graphs
- On the computational complexity of the minimum-dummy-activities problem in a pert network
- On the measurement of complexity in activity networks
- On the minimum dummy-arc problem
- Pancyclic and panconnected line graphs
- The minimum dummy task problem
Cited in
(10)- On the computational complexity of the minimum-dummy-activities problem in a pert network
- A distributionally robust analysis of the program evaluation and review technique
- A note on minimum-dummy-activities PERT networks
- Properties of graphs of problems network planning and management
- Optimal constructions of reversible digraphs
- The minimum dummy task problem
- New heuristics for modeling temporal constraints and generating PERT network with minimum number of dummy-arcs
- scientific article; zbMATH DE number 1517143 (Why is no real title available?)
- Solution of interval PERT/CPM network problems by a simplified tabular method
- Creating an equivalent multi-phases activity network by adding the least dummy activities
This page was built for publication: A new method for constructing a minimal PERT network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q646227)