A nonparametric exponentially weighted moving average control scheme
From MaRDI portal
Cites work
- A Nonparametric Procedure for Process Control Based on Within-Group Ranking
- A Simple Method for Studying Run-Length Distributions of Exponentially Weighted Moving Average Charts
- A Simple Theoretical Approach to Cumulative Sum Control Charts
- Bounds for the Distribution of the Run Length of Geometric Moving Average Charts
- CONTINUOUS INSPECTION SCHEMES
- Improved switching rules in control procedures using variable sampling intervals
- Nonparametric procedures for monitoring a location parameter based on linear placement statistics
- Note on a Distribution-Free CUSUM Technique
- Robust cusum: a robustness study for cusum quality control schemes
- Sequential One-Sample Grouped Signed Rank Tests for Symmetry: Basic Procedures
- Small Sample Power of the One Sample Wilcoxon Test for Non-Normal Shift Alternatives
- The Effect of Serial Correlation on the Performance of CUSUM Tests
- Two Sequential Two-Sample Grouped Rank Tests with Applications to Screening Experiments
Cited in
(16)- A nonparametric exponentially weighted moving average signed-rank chart for monitoring location
- On phase II monitoring of the probability distributions of univariate continuous processes
- A nonparametric synthetic control chart using sign statistic
- Sign control charts with variable sampling intervals
- Distribution-free precedence control charts with improved runs-rules
- Nonparametric quality control charts based on the sign statistic
- The EWMA sign chart revisited: performance and alternatives without and with ties
- An EWMA-type chart based on signed ranks with exact run length properties
- A nonparametric CUSUM control chart for multiple stream processes based on a modified extended median test
- Distribution-Free Quality Control Charts Based on Signed-Rank-Like Statistics
- An EWMA sign chart for dispersion with exact run length properties
- Real-Time Regression Analysis of Streaming Clustered Data With Possible Abnormal Data Batches
- An efficient nonparametric double progressive mean chart for monitoring of the process location
- Distribution-free Phase II triple EWMA control chart for joint monitoring the process location and scale parameters
- A new distribution-free adaptive sample size control chart for a finite production horizon and its application in monitoring fill volume of soft drink beverage bottles
- Phase i distribution-free control charts for individual observations using runs and patterns
This page was built for publication: A nonparametric exponentially weighted moving average control scheme
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4019304)