A note on minimum makespan assembly plans
From MaRDI portal
Recommendations
- Assembly-line scheduling with concurrent operations and parallel machines
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- scientific article; zbMATH DE number 4072689
- scientific article; zbMATH DE number 4012297
- Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
Cites work
Cited in
(4)
This page was built for publication: A note on minimum makespan assembly plans
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1848367)