A production rescheduling expert simulation system
From MaRDI portal
Recommendations
- Rescheduling job shops under random disruptions
- A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
- Production scheduling/rescheduling in flexible manufacturing
- Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning
Cites work
- ``Neural computation of decisions in optimization problems
- A block approach for single-machine scheduling with release dates and due dates
- A knowledge-based controller with fuzzy reasoning used in process control
- An expert neural network system for dynamic job shop scheduling
- Dynamical Neural Network Approach to the Job-shop Scheduling
- On the minimization of the weighted number of tardy jobs with random processing times and deadline
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Scheduling under a common due-date on parallel unrelated machines
- Sequencing jobs on a single machine with a common due data and stochastic processing times
- Simulated annealing: A tool for operational research
Cited in
(11)- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- Using MLP networks to design a production scheduling system
- Polychromatic sets and its application in simulating complex objects and systems
- Reducing simulation models for scheduling manufacturing facilities
- A survey of dynamic scheduling in manufacturing systems
- A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation
- Decision making algorithm for a class of two-level manufacturing systems
- scientific article; zbMATH DE number 1283871 (Why is no real title available?)
- Construction of factory schedules using reverse simulation
- An approach to predictive-reactive scheduling of parallel machines subject to disruptions
- Architecture of manufacturing scheduling systems: literature review and an integrated proposal
This page was built for publication: A production rescheduling expert simulation system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1577764)