Active and stable project scheduling
From MaRDI portal
Recommendations
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- scientific article; zbMATH DE number 2013754
- Project scheduling with calendars
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A survey of variants and extensions of the resource-constrained project scheduling problem
Cited in
(15)- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Work patterns in project scheduling
- Scheduling project activities in a distributed environment
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- The construction of stable project baseline schedules
- Mixed-integer linear programming for resource leveling problems
- On the integration of diverging material flows into resource-constrained project scheduling
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
- Exact methods for the resource levelling problem
- Reducing the feasible region to a scheduling problem
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
- Fifty years of research on resource-constrained project scheduling explored from different perspectives