Ali Allahverdi

From MaRDI portal


List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
Engineering Optimization
2023-10-10Paper
Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times
RAIRO - Operations Research
2023-09-19Paper
Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
Journal of Industrial and Management Optimization
2021-11-12Paper
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
Journal of Industrial and Management Optimization
2021-09-10Paper
Minimizing total completion time for flowshop scheduling problem with uncertain processing times
RAIRO - Operations Research
2021-07-27Paper
Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan
RAIRO - Operations Research
2020-05-13Paper
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
Applied Mathematical Modelling
2020-02-05Paper
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
Applied Mathematical Modelling
2020-01-27Paper
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
Applied Mathematics and Computation
2020-01-14Paper
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
Computational and Applied Mathematics
2019-01-29Paper
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
Applied Mathematical Modelling
2018-10-09Paper
A survey of scheduling problems with no-wait in process
European Journal of Operational Research
2018-05-24Paper
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
European Journal of Operational Research
2018-05-22Paper
Minimizing total tardiness in no-wait flowshops
Foundations of Computing and Decision Sciences
2017-04-25Paper
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
Computers & Operations Research
2016-11-10Paper
The third comprehensive survey on scheduling problems with setup times/costs
European Journal of Operational Research
2016-10-06Paper
Total completion time with makespan constraint in no-wait flowshops with setup times
European Journal of Operational Research
2016-06-23Paper
Heuristics for no-wait flowshops with makespan subject to mean completion time
Applied Mathematics and Computation
2014-06-27Paper
Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
Decision Making in Manufacturing and Services
2011-06-28Paper
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times
Computers & Mathematics with Applications
2010-12-14Paper
Permutation flow shops with exact time lags to minimise maximum lateness
International Journal of Production Research
2010-11-07Paper
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
International Journal of Production Research
2010-11-07Paper
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
International Journal of Production Research
2010-10-25Paper
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Computers & Mathematics with Applications
2010-06-28Paper
The two-stage assembly scheduling problem to minimize total completion time with setup times
Computers & Operations Research
2009-05-19Paper
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
Computers & Operations Research
2009-04-03Paper
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness
Computers & Operations Research
2008-12-04Paper
scientific article; zbMATH DE number 5375343 (Why is no real title available?)
 
2008-12-01Paper
A hybrid tabu search heuristic for the two-stage assembly scheduling problem
 
2008-01-28Paper
scientific article; zbMATH DE number 5230329 (Why is no real title available?)
 
2008-01-28Paper
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
Annals of Operations Research
2008-01-25Paper
The significance of reducing setup times/setup costs
European Journal of Operational Research
2008-01-21Paper
Batching deteriorating items with applications in computer communication and reverse logistics
European Journal of Operational Research
2007-06-13Paper
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
European Journal of Operational Research
2007-05-11Paper
scientific article; zbMATH DE number 5151911 (Why is no real title available?)
 
2007-05-11Paper
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
International Journal of Production Research
2007-03-21Paper
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
International Journal of Production Research
2007-03-21Paper
Using mixed graph coloring to minimize total completion time in job shop scheduling
Applied Mathematics and Computation
2007-01-11Paper
Scheduling multi-stage parallel-processor services to minimize average response time
The Journal of the Operational Research Society
2006-02-13Paper
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests
JMMA. Journal of Mathematical Modelling and Algorithms
2006-01-17Paper
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
European Journal of Operational Research
2005-11-04Paper
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
Computers & Operations Research
2005-11-01Paper
Flowshop scheduling problem to minimize total completion time with random and bounded processing times
The Journal of the Operational Research Society
2005-04-04Paper
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
The Journal of the Operational Research Society
2005-03-16Paper
No-wait flowshops with bicriteria of makespan and total completion time
The Journal of the Operational Research Society
2005-03-14Paper
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
Computers & Operations Research
2005-02-23Paper
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime
International Transactions in Operational Research
2005-01-31Paper
Job lateness in flowshops with setup and removal times separated
The Journal of the Operational Research Society
2005-01-19Paper
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
International Journal of Mathematics and Mathematical Sciences
2003-12-03Paper
New heuristics for no-wait flowshops to minimize makespan.
Computers & Operations Research
2003-11-17Paper
No-wait flowshops with bicriteria of makespan and maximum lateness.
European Journal of Operational Research
2003-10-14Paper
Total flowtime in no-wait flowshops with separated setup times.
Computers & Operations Research
2003-09-07Paper
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times
International Transactions in Operational Research
2003-06-23Paper
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
European Journal of Operational Research
2003-04-28Paper
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
Computers & Operations Research
2002-05-14Paper
The tricriteria two-machine flowshop scheduling problem
International Transactions in Operational Research
2002-01-30Paper
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
Computers & Operations Research
2000-09-26Paper
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
European Journal of Operational Research
1999-12-20Paper
Stochastically minimizing total flowtime in flowshops with no waiting space
European Journal of Operational Research
1999-11-08Paper
Scheduling in stochastic flowshops with independent setup, processing and removal times
Computers & Operations Research
1997-09-17Paper
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
Computers & Operations Research
1997-01-06Paper
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
The Journal of the Operational Research Society
1995-11-09Paper
Two-machine ordered flowshop scheduling under random breakdowns
Mathematical and Computer Modelling
1995-01-11Paper
scientific article; zbMATH DE number 640393 (Why is no real title available?)
 
1994-09-19Paper


Research outcomes over time


This page was built for person: Ali Allahverdi