Almost nonpreemptive schedules
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 962288
- Preemptive scheduling with staircase and piecewise linear resource availability
- Nonpreemptive scheduling of independent tasks with prespecified processor allocations
- Proof of the 4/3 conjecture for preemptive vs. nonpreemptive two-processor scheduling
- On the two-phase method for preemptive scheduling
Cites work
- scientific article; zbMATH DE number 3841894 (Why is no real title available?)
- scientific article; zbMATH DE number 3859178 (Why is no real title available?)
- scientific article; zbMATH DE number 3873052 (Why is no real title available?)
- scientific article; zbMATH DE number 4095196 (Why is no real title available?)
- scientific article; zbMATH DE number 3632548 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Line perfect graphs
- On line perfect graphs
- On the two-phase method for preemptive scheduling
- Open Shop Scheduling to Minimize Finish Time
Cited in
(6)- On the deficiency of bipartite graphs
- Open shop scheduling with some additional constraints
- On preemptive scheduling: A general setting for the two-phase method
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- Preemptive scheduling with staircase and piecewise linear resource availability
- Pre-scheduling
This page was built for publication: Almost nonpreemptive schedules
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q922279)