An agent-based approach for scheduling multiple machines
From MaRDI portal
Recommendations
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- scientific article; zbMATH DE number 2087880
- Parallel machines scheduling with machine preference via agent-based approach
- Agent-based multiple shop floor manufacturing scheduler
- Agent-based scheduling in production systems
Cited in
(23)- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
- A multi-agent system for the weighted earliness tardiness parallel machine problem
- An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines
- Single-machine multi-agent scheduling problems with a global objective function
- A survey of scheduling problems with setup times or costs
- Parallel machines scheduling with machine preference via agent-based approach
- scientific article; zbMATH DE number 6672372 (Why is no real title available?)
- Multi-agent based beam search for intelligent production planning and scheduling
- A multi-agent based cooperative approach to scheduling and routing
- Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups
- A hybrid control architecture and coordination mechanism in virtual manufacturing enterprise
- Scheduling Solutions for the Paper Industry
- Multi-criteria scheduling: an agent-based approach for expert knowledge integration
- scientific article; zbMATH DE number 1088301 (Why is no real title available?)
- Two Heterarchical Multiagent Approaches for FMS Dynamic Scheduling
- scientific article; zbMATH DE number 2084602 (Why is no real title available?)
- Agent-based multiple shop floor manufacturing scheduler
- scientific article; zbMATH DE number 2084818 (Why is no real title available?)
- scientific article; zbMATH DE number 2085240 (Why is no real title available?)
- scientific article; zbMATH DE number 2087880 (Why is no real title available?)
- Solving then-job 3-stage flexible flowshop scheduling problem using an agent-based approach
- Minimizing weighted earliness and tardiness on parallel machines using a multi-agent system
- Supply Chain Planning Models in the Pulp and Paper Industry
This page was built for publication: An agent-based approach for scheduling multiple machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5950279)