Assembly line team sizing with absenteeism
From MaRDI portal
Recommendations
- Optimal workforce assignment to operations of a paced assembly line
- Minimizing the number of workers in a paced mixed-model assembly line
- scientific article; zbMATH DE number 4074792
- Workforce Planning in Mixed Model Assembly Systems
- Formulation of workforce skill constraints in assembly line balancing models
- Worker allocation in lean U-shaped production lines
- Formulation of a problem involving assembly lines with multiple manning of work stations
- Production lot sizing under setup and worker learning
- Balancing of simple assembly lines under variations of task processing times
Cited in
(6)- Modelling teams and workgroups in manufacturing
- Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study
- Chained cross-training of assembly line workers
- Temporal Pattern in Number of Staff on Sick Leave: The Effect of Downsizing
- Effects of high labour turnover in a serial assembly environment
- DEMONSTRATING WORKER QUALITY THROUGH STRATEGIC ABSENTEEISM
This page was built for publication: Assembly line team sizing with absenteeism
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3163105)