Assignment of Freight Traffic in a Large-Scale Intermodal Network under Uncertainty
From MaRDI portal
Abstract: This paper presents a methodology for freight traffic assignment in a large-scale road-rail intermodal network under uncertainty. Network uncertainties caused by natural disasters have dramatically increased in recent years. Several of these disasters (e.g., Hurricane Sandy, Mississippi River Flooding, Hurricane Harvey) severely disrupted the U.S. freight transport network, and consequently, the supply chain. To account for these network uncertainties, a stochastic freight traffic assignment model is formulated. An algorithmic framework, involving the sample average approximation and gradient projection algorithm, is proposed to solve this challenging problem. The developed methodology is tested on the U.S. intermodal network with freight flow data from the Freight Analysis Framework. The experiments consider four types of natural disasters that have different risks and impacts on the transportation network: earthquake, hurricane, tornado, and flood. The results demonstrate the feasibility of the model and algorithmic framework to obtain freight flows for a realistic-sized network in reasonable time (between 417 and 716 minutes). It is found that for all disaster scenarios the freight ton-miles are higher compared to the base case without uncertainty. The increase in freight ton-miles is the highest under the flooding scenario; this is due to the fact that there are more states in the flood-risk areas and they are scattered throughout the U.S.
This page was built for publication: Assignment of Freight Traffic in a Large-Scale Intermodal Network under Uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6504318)