Basic optimality results for Bayesian group replacement policies.
From MaRDI portal
Recommendations
Cites work
Cited in
(5)- Advances in Bayesian decision making in reliability
- Operating characteristics of a failure counting group replacement policy
- A case study of reliability and performance of the electric power distribution station based on time between failures
- Bayesian Group Replacement Policies
- Redesign policy for a system with uncertain failure rates
This page was built for publication: Basic optimality results for Bayesian group replacement policies.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1426733)