Basic scheduling problems with raw material constraints
From MaRDI portal
Recommendations
Cited in
(20)- Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times
- Approximability of scheduling problems with resource consuming jobs
- A PTAS for a resource scheduling problem with arbitrary number of parallel machines
- Approximation schemes for single machine scheduling with non-renewable resource constraints
- Reductions between scheduling problems with non-renewable resources and knapsack problems
- A multivariate complexity analysis of the material consumption scheduling problem
- A unified solution framework for flexible job shop scheduling problems with multiple resource constraints
- Complexity of single machine scheduling subject to nonnegative inventory constraints
- Scheduling with non-renewable resources: minimizing the sum of completion times
- Product selection, machine time allocation, and scheduling decisions for manufacturing perishable products subject to a deadline
- Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource
- Interweaving real-time jobs with energy harvesting to maximize throughput
- EPTAS for load balancing problem on parallel machines with a non-renewable resource
- EPTAS for load balancing problem on parallel machines with a non-renewable resource
- Interweaving real-time jobs with energy harvesting to maximize throughput
- Approximation schemes for parallel machine scheduling with non-renewable resources
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Approximability of total weighted completion time with resource consuming jobs
This page was built for publication: Basic scheduling problems with raw material constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3367034)