Bounding distributions for a stochastic pert network
From MaRDI portal
Cited in
(17)- Bounding the expected time-cost curve for a stochastic PERT network from below
- A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network
- A factoring approach for the stochastic shortest path problem
- The most critical path in a PERT network: A heuristic approach
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Stochastic and fuzzy PERT
- Solving linear programs with multiple right-hand sides: Pricing and ordering schemes
- Exploiting partial correlations in distributionally robust optimization
- Global optima results for the Kauffman \(NK\) model
- Stochastic scheduling problems I — General strategies
- Some remarks on the expected delay of project duration in a PERT network
- Algebraic methods applied to shortest path and maximum flow problems in stochastic networks
- Stochastic networks and the extreme value distribution
- Network reliability: Heading out on the highway
- Criticality analysis of activity networks under interval uncertainty
- Analysis of the impact of corrective actions for stochastic project networks
- A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing
This page was built for publication: Bounding distributions for a stochastic pert network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4143186)