Comparative study of dynamic lot sizing heuristics with backlogging
From MaRDI portal
Recommendations
Cites work
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- A Sequential Lot Sizing Heuristic with Optimal Average Performance
- Deterministic Production Planning: Algorithms and Complexity
- Dynamic version of the economic lot size model
- Efficient heuristics for dynamic lot sizing
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
- Eyeballing heuristics for dynamic lot size problems
- Note—Performance Bounds for Lot Sizing Heuristics
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Two-way eyeballing heuristics in dynamic lot sizing with backlogging
Cited in
(6)- Comparison of EOQ-independent lot-sizing heuristic rules
- Two-way eyeballing heuristics in dynamic lot sizing with backlogging
- Extensions of simple eyeballing dynamic lot sizing heuristics.
- Lot-sizing heuristics for continuous time-varying demand and shortages
- Lot sizing and scheduling -- survey and extensions
- Eyeballing heuristics for dynamic lot size problems
This page was built for publication: Comparative study of dynamic lot sizing heuristics with backlogging
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1200833)