Complexity analysis of integrated dynamic lot sizing and maintenance planning problems
From MaRDI portal
Cites work
- A review on maintenance optimization
- A single-item lot-sizing problem with a by-product and inventory capacities
- An integrated production and preventive maintenance planning model
- Approximation algorithms for the capacitated multi-item lot-sizing problem via flow-cover inequalities
- Competition under time‐varying demands and dynamic lot sizing costs
- Dynamic version of the economic lot size model
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Integrated production planning and preventive maintenance in deteriorating production systems
- Integrating maintenance and production decisions in a hierarchical production planning environment
- Joint condition-based maintenance and inventory optimization for systems with multiple components
- Joint optimization of condition-based maintenance and production lot-sizing
- Minimizing the makespan for the flow shop scheduling problem with availability constraints.
- Minimizing total completion time on a single machine with a flexible maintenance activity
- Network flows. Theory, algorithms, and applications.
This page was built for publication: Complexity analysis of integrated dynamic lot sizing and maintenance planning problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6982859)