Compressed workweek scheduling with differing weekdays and weekends labor demands
From MaRDI portal
Recommendations
- Dual-based optimization of cyclic four-day workweek scheduling
- scientific article; zbMATH DE number 1783870
- Optimum workforce scheduling under the (14, 21) days-off timetable
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands
- Four-day workweek scheduling with two or three consecutive days off
Cited in
(7)- Sizing and scheduling a full-time and part-time workforce with off-day and off-weekened constraints
- Using compressed workweeks to save labour cost
- Dual-based optimization of cyclic four-day workweek scheduling
- Workload coverage through nonsmooth optimization
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands
- scientific article; zbMATH DE number 1783870 (Why is no real title available?)
- Heuristics for Large Scale Labour Scheduling Problems in Retail Sector
This page was built for publication: Compressed workweek scheduling with differing weekdays and weekends labor demands
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3626417)