Concurrent operations assignment and sequencing for particular assembly problems in flow lines
From MaRDI portal
Recommendations
- Assembly-line scheduling with concurrent operations and parallel machines
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Optimal workforce assignment to operations of a paced assembly line
- Optimally balancing assembly lines with different workstations
- Optimal distribution of technological operations on an assembly line
Cited in
(14)- scientific article; zbMATH DE number 1738680 (Why is no real title available?)
- Balancing and scheduling of flexible mixed model assembly lines
- Dispatching problems for parallel machines in the TFT‐LCD assembly process
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Scheduling in manufacturing with transportation: classification and solution techniques
- Bi-directional work sharing in assembly lines with strict and flexible assembly sequences
- Searching optimal resequencing and feature assignment on an automated assembly line
- Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines
- Minimizing task completion time with the execution set method
- A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- scientific article; zbMATH DE number 4074792 (Why is no real title available?)
- Assembly-line scheduling with concurrent operations and parallel machines
This page was built for publication: Concurrent operations assignment and sequencing for particular assembly problems in flow lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1357763)