Data-driven remanufacturing planning with parameter uncertainty
From MaRDI portal
Abstract: We consider the problem of remanufacturing planning in the presence of statistical estimation errors. Determining the optimal remanufacturing timing, first and foremost, requires modeling of the state transitions of a system. The estimation of these probabilities, however, often suffers from data inadequacy and is far from accurate, resulting in serious degradation in performance. To mitigate the impacts of the uncertainty in transition probabilities, we develop a novel data-driven modeling framework for remanufacturing planning in which decision makers can remain robust with respect to statistical estimation errors. We model the remanufacturing planning problem as a robust Markov decision process, and construct ambiguity sets that contain the true transition probability distributions with high confidence. We further establish structural properties of optimal robust policies and insights for remanufacturing planning. A computational study on the NASA turbofan engine shows that our data-driven decision framework consistently yields better worst-case performances and higher reliability of the performance guarantee
Cites work
- A dynamic auto-adaptive predictive maintenance policy for degradation with unknown parameters
- Collecting mode selection in a remanufacturing supply chain under cap-and-trade regulation
- Conic programming reformulations of two-stage distributionally robust linear programs over Wasserstein balls
- Data uncertainty in Markov chains: application to cost-effectiveness analyses of medical innovations
- Data-driven distributionally robust optimization using the Wasserstein metric: performance guarantees and tractable reformulations
- Development of robust design-for-remanufacturing guidelines to further the aims of sustainable development
- Distributionally robust optimization under moment uncertainty with application to data-driven problems
- Green supply chains with carbon trading and environmental sourcing: formulation and life cycle assessment
- Joint optimization of sampling and control of partially observable failing systems
- Markov Decision Processes with Imprecise Transition Probabilities
- Markovian Decision Processes with Uncertain Transition Probabilities
- Optimally maintaining a Markovian deteriorating system with limited imperfect repairs
- Parameter Imprecision in Finite State, Finite Action Dynamic Programs
- Percentile Optimization for Markov Decision Processes with Parameter Uncertainty
- Recovering best statistical guarantees via the empirical divergence-based distributionally robust optimization
- Robust Control of Markov Decision Processes with Uncertain Transition Matrices
- Robust control of partially observable failing systems
- Robust Dynamic Programming
- Robust Markov Decision Processes
- Sensitivity of optimal replacement policies to lifetime parameter estimates
- Structured replacement policies for components with complex degradation processes and dedicated sensors
This page was built for publication: Data-driven remanufacturing planning with parameter uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6112739)