Deterministic Scheduling with Pipelined Processors
From MaRDI portal
Cited in
(9)- Computing the bump number with techniques from two-processor scheduling
- Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity
- On scheduling cycle shops: Classification, complexity and approximation
- A metric approach for scheduling problems with minimizing the maximum penalty
- Minimizing the makespan in a two-machine cross-docking flow shop problem
- Polynomial-time approximation schemes for scheduling problems with time lags
- Coupled-task scheduling with time windows, bounded pathwidth and bounded slack is para-NP-complete
- Minimizing makespan for a bipartite graph on a single processor with an integer precedence delay.
- Single machine scheduling with precedence constraints and bounded maximum delay value
This page was built for publication: Deterministic Scheduling with Pipelined Processors
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3868759)