Due-date assignment and parallel-machine scheduling with deteriorating jobs
From MaRDI portal
Recommendations
- Due-date assignment and single machine scheduling with deteriorating jobs
- Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
- Scheduling of single machine with deteriorating jobs and due-date assignment
- Scheduling of deteriorating jobs with release dates to minimize the maximum lateness
- A note on due-date assignment and single-machine scheduling with deteriorating jobs
Cited in
(9)- Scheduling with due date assignment under special conditions on job processing
- Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
- Due-date assignment and single machine scheduling with deteriorating jobs
- Four single-machine scheduling problems involving due date determination decisions
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration
- Scheduling of deteriorating jobs with release dates to minimize the maximum lateness
- Single machine group scheduling with time dependent processing times and ready times
This page was built for publication: Due-date assignment and parallel-machine scheduling with deteriorating jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5447776)