Dynamic assignation of due-dates in an assembly shop based in simulation
From MaRDI portal
Recommendations
- Integration of priority dispatching and due-date assignment in a job shop
- Regression-based due date assignment rules for improved assembly shop performance
- Dynamic job shop scheduling for missed due date performance
- Setting Job-Shop Due-Dates with Service-Level Constraints
- Simulation study of job shop scheduling with due dates
Cited in
(14)- A survey of the state-of-the-art of common due date assignment and scheduling research
- Real-time prediction of order flowtimes using support vector regression
- Dynamic job shop scheduling for missed due date performance
- A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation
- The cycle time distribution
- Setting Job-Shop Due-Dates with Service-Level Constraints
- Simulation study of job shop scheduling with due dates
- Integration of priority dispatching and due-date assignment in a job shop
- Integrating order release control with due-date assignment rules
- A Simulation Study of Due-date Assignment Rules in a Dynamic Job Shop
- Regression-based due date assignment rules for improved assembly shop performance
- Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop
- Real-time due-date promising by build-to-order environments
- Development of a regression-based method with case-based tuning to solve the due date assignment problem
This page was built for publication: Dynamic assignation of due-dates in an assembly shop based in simulation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4230164)