Economic optimization in a fixed sequence of unreliable inspections
From MaRDI portal
Recommendations
- Sequencing counts: a combined approach for sequencing and selecting costly unreliable off-line inspections
- Economic optimization of off-line inspection with inspection errors
- Optimal sequencing of production and inspection operations
- Sequencing of imperfect inspection operations subject to constraints on the quality of accepted and rejected units
- Two optimization models of the optimum inspection problem
Cited in
(15)- A nonpolynomial optimal algorithm for sequencing inspectors in a repeat inspection system with rework
- Sequencing counts: a combined approach for sequencing and selecting costly unreliable off-line inspections
- Optimal sequencing of inspection of dependent characteristics
- A note on an optimal choice problem
- Limits to human optimization in inspection performance
- A two-state partially observable Markov decision process with three actions
- scientific article; zbMATH DE number 147407 (Why is no real title available?)
- MISUSE AND OPTIMUM INSPECTING STRATEGY IN AGENCY PROBLEMS
- Optimal sequencing of production and inspection operations
- Optimal design of the inspection buffer for an unreliable process
- Economic optimization of off-line inspection with inspection errors
- Optimal sequential inspection of reliability systems subject to parallel-chain with single direction and single cross precedence constraints
- Optimal sequential inspection policies
- Optimal and heuristic solutions to the variable inspection policy problem
- Economic optimization of off-line inspection with rework consideration
This page was built for publication: Economic optimization in a fixed sequence of unreliable inspections
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4661111)