Estimation of change point in generalized variance control chart
From MaRDI portal
Recommendations
- A multivariate change point detection procedure for monitoring mean and covariance simultaneously
- Identifying the time of a step change with multivariate single control charts
- Estimation of the Change Point in Monitoring the Process Mean and Variance
- Estimation of the Change Point in theX¯andSControl Charts
- Control Charts for the Mean and Variance based on Changepoint Methodology
Cites work
- Estimation of the Change Point in theX¯andSControl Charts
- GENERALIZED VARIANCE CHART DESIGN WITH ADAPTIVE SAMPLE SIZES. THE BIVARIATE CASE
- Inference about the change-point in a sequence of random variables
- Multivariate control charts for process dispersion
- Multivariate Process Variability Monitoring
- Statistical properties of the lsi multivariate control chart
Cited in
(11)- Optimal designs of multivariate synthetic \(|S|\) control chart based on median run length
- Estimation of the Change Point in theX¯andSControl Charts
- Double sampling |S| control chart with variable sample size and variable sampling interval
- Control Charts for the Mean and Variance based on Changepoint Methodology
- A multivariate change point detection procedure for monitoring mean and covariance simultaneously
- Maximum likelihood estimation of the change point in stationary state of auto regressive moving average (ARMA) models, using SVD-based smoothing
- Identifying the time of change in the mean of a two-stage nested process
- Identifying the time of a step change with multivariate single control charts
- Multivariate synthetic \(|S|\) control chart with variable sampling interval
- Economically Optimal Design of a Multivariate SyntheticT2Chart
- Estimation of the Change Point in Monitoring the Process Mean and Variance
This page was built for publication: Estimation of change point in generalized variance control chart
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3015850)