Exact method for the two-machine flow-shop problem with time delays
From MaRDI portal
Recommendations
- Lower bounds for the two-machine flow shop problem with time delays
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- Minimizing total completion time in two-machine flow shops with exact delays
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- Two-machine flow shop scheduling problems with minimal and maximal delays
Cites work
- scientific article; zbMATH DE number 900396 (Why is no real title available?)
- A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays
- A practical use of Jackson's preemptive schedule for solving the job shop problem
- A survey of scheduling problems with setup times or costs
- Algorithms and Computation
- Lower bounds for the two-machine flow shop problem with time delays
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
- Optimal two- and three-stage production schedules with set-up time included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Sequencing \(n\) jobs on two machines with arbitrary time lags
- Shop Problems With Two Machines and Time Lags
- UET flow shop scheduling with delays
Cited in
(9)- Analysis of heuristics for the UET two-machine flow shop problem with time delays
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- Scheduling in manufacturing with transportation: classification and solution techniques
- Lower bounds for the two-machine flow shop problem with time delays
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays
- Two-machine flow shop scheduling problems with minimal and maximal delays
- Minimizing total completion time in two-machine flow shops with exact delays
- Exact solution of the two-machine flow shop problem with three operations
This page was built for publication: Exact method for the two-machine flow-shop problem with time delays
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q829189)