Flow Shop Problems with Time Lags
From MaRDI portal
Cited in
(8)- Time lag size in multiple operations flow shop scheduling heuristics
- Reduction of job-shop problems to flow-shop problems with precedence constraints
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal
- Clustered flow shop models
- An approximate solution of the flow-shop problem with sequence dependent setup times
- The flow shop problem with time lags and separated setup times
- Flowshop-scheduling problems with makespan criterion: a review
- Transportation and delivery in flow-shop scheduling problems: a systematic review
This page was built for publication: Flow Shop Problems with Time Lags
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3659509)