Hatem Hadda

From MaRDI portal



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
On the two-stage assembly flow shop problem
Top
2024-08-26Paper
Approximation results for the two-machine job shop under limited machine availability
Opsearch
2018-10-09Paper
On the optimality conditions of the two-machine flow shop problem
European Journal of Operational Research
2018-05-30Paper
On the two-stage hybrid flow shop with dedicated machines
RAIRO - Operations Research
2015-10-20Paper
The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis
Journal of Mathematical Modelling and Algorithms in Operations Research
2014-12-16Paper
A PTAS for a particular case of the two-machine flow shop with limited machine availability
Journal of Mathematical Modelling and Algorithms in Operations Research
2014-12-16Paper
Exact resolution of the two-stage hybrid flow shop with dedicated machines
Optimization Letters
2014-12-05Paper
A note on the two-stage hybrid flow shop problem with dedicated machines
Optimization Letters
2012-12-28Paper
A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints
Optimization Letters
2012-11-30Paper
An improved algorithm for the two machine flow shop problem with several availability constraints
4OR
2010-12-06Paper
An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs
4OR
2010-05-21Paper
Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
RAIRO - Operations Research
2009-11-12Paper
A (\(\frac {4}{3}\))-approximation algorithm for a special case of the two machine flow shop problem with several availability constraints
Optimization Letters
2009-10-15Paper


Research outcomes over time


This page was built for person: Hatem Hadda