Heuristic solutions to the long-term unit commitment problem with cogeneration plants
From MaRDI portal
Recommendations
- Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination
- A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation
- scientific article; zbMATH DE number 1308831
- A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
- A variant of the dynamic programming algorithm for unit commitment of combined heat and power systems
- scientific article; zbMATH DE number 1264433
- Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages
- Solving the unit commitment problem by a unit decommitment method
Cites work
- scientific article; zbMATH DE number 3614502 (Why is no real title available?)
- scientific article; zbMATH DE number 1312984 (Why is no real title available?)
- scientific article; zbMATH DE number 1041084 (Why is no real title available?)
- An Application of Lagrangian Relaxation to Scheduling in Power-Generation Systems
- An efficient linear model and optimisation algorithm for multi-site combined heat and power production
- An efficient linear programming algorithm for combined heat and power production.
- Conflict analysis in mixed integer programming
- Efficient algorithms for combined heat and power production planning under the deregulated electricity market
- Local branching
- Production Planning by Mixed Integer Programming
- Short-Term Scheduling of Thermal-Electric Generators Using Lagrangian Relaxation
- Solving Nonlinear Single-Unit Commitment Problems with Ramping Constraints
Cited in
(6)- Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages
- VNS based heuristic for solving the unit commitment problem
- Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination
- A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
- Operational planning of combined heat and power plants through genetic algorithms for mixed 0-1 nonlinear programming
- Coordination between long-term decision process and day-ahead unit commitment in deregulated markets: a fuzzy hierarchical bi-level modeling approach
This page was built for publication: Heuristic solutions to the long-term unit commitment problem with cogeneration plants
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761973)