Improved dynamic programs for some batching problems involving the maximum lateness criterion
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 7070855
- Batch scheduling to minimize maximum lateness
- Scheduling a batching machine
- Bicriteria scheduling of minimizing maximum lateness and makespan on a serial-batching machine
- Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan
Cites work
- scientific article; zbMATH DE number 3481857 (Why is no real title available?)
- scientific article; zbMATH DE number 830382 (Why is no real title available?)
- A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time
- Batch sizing and job sequencing on a single machine
- Batching in single operation manufacturing systems
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Improved Algorithms for Economic Lot Size Problems
- Scheduling Groups of Jobs on a Single Machine
- Scheduling a batching machine
- Scheduling the production of two-component jobs on a single machine
- Scheduling with batching: A review
- The complexity of one-machine batching problems
- Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions
Cited in
(10)- scientific article; zbMATH DE number 7070855 (Why is no real title available?)
- Solving the two-machine open shop problem with a single server with respect to the makespan
- Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness
- Algorithms for two-agent unbounded serial-batch scheduling with makespan and maximum lateness objectives
- Two-machine open shop problem with a single server and set-up time considerations
- Split-merge: using exponential neighborhood search for scheduling a batching machine
- A survey of scheduling problems with setup times or costs
- Unbounded parallel-batching scheduling with two competitive agents
- A new effective dynamic program for an investment optimization problem
- A linear time approximation scheme for scheduling unbounded batch machines with delivery times and inclusive processing set restrictions
This page was built for publication: Improved dynamic programs for some batching problems involving the maximum lateness criterion