Improved polynomial algorithms for robust bottleneck problems with interval data
From MaRDI portal
Recommendations
- Minmax regret bottleneck problems with solution-induced interval uncertainty structure
- Interval data minmax regret network optimization problems
- On the complexity of a class of combinatorial optimization problems with uncertainty
- Minmax regret solutions for minimax optimization problems with uncertainty
- Algorithms for the robust 1-center problem on a tree
Cites work
- Algorithms for two bottleneck optimization problems
- An \(O(n \log^ 2\,n)\) algorithm for the maximum weighted tardiness problem
- An augmenting path method for solving linear bottleneck assignment problems
- An improved algorithm for selecting \(p\) items with uncertain returns according to the minmax-regret criterion
- Complexity of minimizing the total flow time with interval data and minmax regret criterion
- scientific article; zbMATH DE number 3449757 (Why is no real title available?)
- Improved complexity bound for the maximum cardinality bottleneck bipartite matching problem
- Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion
- Minmax regret solutions for minimax optimization problems with uncertainty
- On the complexity of the robust spanning tree problem with interval data
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Robust discrete optimization and its applications
- The computational complexity of the relative robust shortest path problem with interval data
- The partial sum criterion for Steiner trees in graphs and shortest paths
- The symmetric traveling salesman problem and edge exchanges in minimal 1- trees
Cited in
(6)- Minimizing maximum cost for a single machine under uncertainty of processing times
- Lawler's minmax cost problem under uncertainty
- Sensitivity analysis for bottleneck assignment problems
- Single machine scheduling problems with uncertain parameters and the OWA criterion
- Minmax regret bottleneck problems with solution-induced interval uncertainty structure
- Solution algorithms for unrelated machines minmax regret scheduling problem with interval processing times and the total flow time criterion
This page was built for publication: Improved polynomial algorithms for robust bottleneck problems with interval data
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1046706)