Improving the performance of the zone control chart
From MaRDI portal
Recommendations
Cited in
(13)- Statistical process control using Shewhart control charts with supplementary runs rules
- A Simple Method for Computing the Arl of [ILM0001]-Charts with Zone Tests
- The run sum R chart with fast initial response
- Design of a flexible zone individuals control chart
- scientific article; zbMATH DE number 1039098 (Why is no real title available?)
- scientific article; zbMATH DE number 1959651 (Why is no real title available?)
- RUN LENGTH COMPARISONS OF SHEWHART CHARTS AND MOST POWERFUL TEST CHARTS FOR THE DETECTION OF TRENDS AND SHIFTS
- New run sum t charts with variable sampling intervals for process mean
- Transition probabilities and ARL performance of Six Sigma zone control charts
- Zone control charts with estimated parameters for detecting prespecified changes in linear profiles
- The continuous run sum chart
- A phase II run sum chart for monitoring process mean and variability
- Influence of process shifts in case of Six Sigma-based Bayesian control charts
This page was built for publication: Improving the performance of the zone control chart
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4843856)